MegadealsSubsidy Tracker Individual Entry
Company: Louisiana Green Fuels LLC
Parent Company:
Subsidy Source: state
Location: Louisiana
City: Columbia
County: Caldwell
Address: 106 Riverton Camp Rd.
Zip: 71418
NAICS Industry Code: 325199
Project Description: This project includes construction of a new power plant that will entail the major categories of site work & foundations, engineering, structural steel, HVAC, fire protection, new boiler system, particulate APC system, DENOX system, wood processing and handling equipment, ash handling system, water treatment, storage tanks, pumping and auxiliary systems, steam and distribution piping, hoppers, flues, ducts, instrument & control systems, heat rejection and generating systems, electrical equipment, and normal piping, control values, transformers and power lines (within the fence line). The project will also entail the construction of a Carbon Capture & Sequestration System for capturing and sequestering carbon dioxide. The main investment of this project is to construct a new renewable fuels manufacturing plant that entails site work, engineering, foundations, construction of an administration building at 7,500 sq ft (which will house operation personnel, quality control/assurances, controls, and computer systems vital to overseeing operations at the plant), warehouse at 23,000 sq ft, and maintenance/equipment repair shop at approximately 25,000 sq feet, structural steel, electrical equipment, instrumentation and controls, process equipment, piping, values, biomass handling, gasification island, syngas cleaning & treatment, acid gas removal, CO2 compression, various gas systems (fuel gas, natural gas, oxygen, nitrogen), water treatment system, storage tanks, flare & oxidizer, fire water systems, product dispatch and loading system, railcar loading system, and drain systems.
Year: 2023
Subsidy Value: $167,644,721
Program Name: Industrial Tax Exemption
Awarding Agency: Commerce & Industry Board
Type of Subsidy: property tax abatement
Number of Jobs or Training Slots: 5
Wage Data: $250,000
Wage Data Type: Estimated New Payroll
Capital Investment: $1,947,093,164
Source of Data:
(click here)
Notes: Year is Application Board Approval Date. Subsidy is the Estimated First Year Exemption multiplied by 5 (the number of subsidy years). Jobs figure is number of new positions. Investment data is the sum of Estimated Building And Material, Estimated Machinery and Equipment, and Estimated Labor And Engineering which equal the Total Estimated Investment. The subsidy can be renewed for additional 5 years. Search for possible associated entries.
Source Notes: If an online information source is not working, check the Tracker